Which baseline HVAC system do I use if my building has no heating or air conditioning? SEAN BEILMAN, P.E., HBDP, LEED AP BD+C 14 yrs as a Mechanical Engineer 9 yrs at BCER Engineering ASHRAE SSPC 90.1 Committee Member ECB Subcommittee Technical Editor of the 90.1, 2013 User’s Manual Technical Editor of the 189.1, 2014 User’s Manual 2. What should I use?Ĭan the Passive House Planning Package (PHPP) be used to energy model for LEED?Ĭan the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet? The Section 9 space-by-space method does not include residential space types. SSPC 90.1 Work Plan June 2007 Goal: A 2010 standard that results in 30 total energy cost savings improvement compared to Standard 90.1-2004. This Manual: Offers information on the intent and application of Standard 90. How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1? This User's Manual provides detailed instruction for the design of commercial and high-rise residential buildings to ensure their compliance with ANSI/ASHRAE/IES Standard 90.1-2010.
How do I provide a zip code for an international location?įor a project outside the U.S., how do I determine the climate zone?įor a project outside the U.S., how do I determine the Target Finder score?ĭo hotel rooms need automatic light shut-off control? How should this be accounted for?Ĭan mezzanines open to floors below be excluded from the energy model? The project is built on a site with existing exterior lighting installed. Should I use that for my documentation, or 90.1-2007?Ĭan I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements? Our local code references ASHRAE 90.1-2010. HVAC sections of ASHRAE Standard 90.
What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p of SSPC 90.1 (Mick Schwedler), and the primary author of the HVAC sections in the User Manuals for both standards (Steve Taylor), discuss the potentially conflicting requirements and design choices. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. Our project has a large process load-75%. The ASHRASE 90.1 Section 11 and Appendix G Submittal Review Manual (the. Compliance options for each section of ASHRAE Standard 189.1-2014. Can we exclude it from our model?įor an existing building, do I need to rotate the model? Commercial building energy codes such as ASHRAE Standard 90.1 typically include. Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?Ī portion of our building envelope is historic.